2013 February 27th APF SB 071206-E Flotation Equipment
2013 February 12th UPT SB 20121106-Rev 1 Removal of Support Washer from Reserve Staging Loop
2013 February 8th Sun Path SBSB008 Rev-1 Release Cable Trimming
2013 January 31st Airtec SB C2 0113 Systems Test CYPRES 2 units manufactured Feb 2009 through Dec 2012 Click HERE for FAQs on this SB
2012 December 18th Paratec TSB 2012-11 Damaged Reserve Loops on Next Tandem containers
2012 September 27th Sunpath SB SPSB007 Rev 1. Part No. SPF-001-1 Soft Ripcord Pad/Handle Mandatory Inspection
2012 August 9th STRONG ENTERPRISES SB # 33 re Aerodyne TM Mains "A2" Sizes: 350, 370 & 389 use in Dual Hawk Tandem System
2012 July 13th Aerazur (Parachutes de France) SB_25_63_02 Atom Tandem 740-1 Pickable Textile Reserve Handle
2012 June 20th AVA Sports Ltd. Airworthiness Directive 20.06.2012 Avalon harness containers. Inspection of cutaway cables
2012 April 20th PARACHUTE SYSTEMS PS 04202012 re Decelerator Reserve Lower Steering Toggles and Vortex 2 Reserve Toggles
2012 March 7th VIGIL INFORMATION BULLETIN: VIGIL LCD Software version 2.20
2012 February 2nd STRONG ENTERPRISES SB #32 re Icarus 364, 365 and 400 main canopies use in Dual Hawk Tandem Systems